We install roofing systems better than current Georgia building code. By installing roofs this way, you get GAF’s factory-backed Lifetime Systems Plus warranty.
Materials are placed in the driveway the day of installation (as close to the roof as possible)
We have our own dump trailer, It leaves when we do!
Tarps are used to protect perimeter and A/C units
Rotten decking is replaced
1st two sheets are free, each additional is $34 (OSB), $42 (Plywood), $3/ft (1×6″)
Ice/Water Shield installed in valleys and transition areas
Ice / Water Shield installed around chimney and all protrusions
GAF Pro-start starter shingles installed on the entire perimeter of your home
GAF Synthetic Felt installed. It’s 25x stronger than 15# felt
Shingles installed to manufacturer specifications using 5-6 nails per shingle
Single plastic boots fail
Rain Collars extend boots life
Step-flashing & Kicks installed properly move water where it’s supposed to be
Counter flashing added where shingles meet brick
Drip edge installed on rakes / eaves
Current Ventilation is Corrected
Ridge-vent installed Debris will fall into attic space!
Cap shingles hand nailed to ridge
Cut up 3-Tab shingles are never used as cap for architectural installs
GAF premium ridge-cap installed
We will never do this! (use field shingles for starter)
Or this (toe-boards)! All our crews have ropes and harnesses
Satellite dishs installed wrong voids the shingle warranty
Gutters blown out
Grounds are cleaned & swept with magnets!
We have families to, so we clean like your kids run around your yard barefoot!
Extra Notes
GAF’s Systems Plus Warranty extended at no additional cost to any homeowner
A Project Supervisor will be assigned to each job to answer questions, take pictures,
and assist with the crews work-flow by getting any materials they may need.
We’ll handle all insurance supplemental paperwork if there are any shortages on
measurements or line items missing from their scope.
The End!
If you’ve got questions about any part of this . . .